context/central-kowloon-route

A 4.7 km long dual 3-lane trunk road connecting the West Kowloon reclamation and the proposed Kai Tak Development, including a tunnel of about 3.9km long. Project website: https://ckr-hyd.hk/?lang=en Tunnel overview drawing: https://www.hyd.gov.hk/en/our_projects/road_projects/6461th/HMW6461TH-SK0765_20160125.pdf

Versions

Created on Jun 8, 2024
1
Mv